What is an Accessory Structure?

Accessory uses and buildings are secondary to the primary use of a building.  In a residential project examples of a typical accessory buildings include  decks, sheds, and garages.  An accessory building is generally smaller than the main building and require a permit if the proposed project is larger than 10 square meters (108 sq ft).  In the case of a deck, if it is over 2 feet higher than the ground it will need a permit, regardless of the size. 

Zoning

When planning an accessory building it’s very important to check the zoning requirements for things like lot line setbacks and lot coverage.  Lot coverage is the percentage of a lot covered by buildings and structures as defined in the zoning bylaw.  A certain amount of open space is necessary to allow for proper grading and drainage, provide space for amenities and maintain the character of a neighborhood.    Visit North Perth’s Zoning page for more information.

Permit Application - Forms and Guidelines for Accessory Structure Permits

Click here to go to our Forms/Documents Page to download any forms listed below.

* signifies additional documents that might be required depending on your project

This is part of the Cloud Permit Process and done through the software, no additional document is required when submitting through CloudPermit

A property layout plan is a visual representation of the arrangement and dimensions of structures, features, and boundaries on a piece of land, showing the placement of buildings, driveways, utilities, and landscaping in relation to property lines and zoning requirements.

Identifies the responsible party for the construction project, ensuring accountability.

a. If property owner is taking accountability, please fill out the form and reason for exemption is “homeowner” and BCIN not required.

b. If 600 meters squared (1968 square feet) or larger, not needed and commitment to general review form is required

Ensuring the current property owner grants permission to either construct themselves or to have another party, such as a contractor or builder, to apply for and manage a building permit on their behalf.

If new build or addition, we required the engineered stamped truss package at the time of application and before plans examination can begin.  

Required by Professional Engineer or Architect on projects greater than 600 meters squared/1968 square feet 

Requires its own separate permit for new or repaired septic systems.

Detailed drawings for HVAC, Plumbing, and Electrical documents for most new construction and major renovation projects.

New Construction or land use changes on properties adjacent to agricultural operations done by a certified professional

Required for new or expanding agricultural operations that generate manure or other agricultural wase

Contact Us

Municipality of North Perth
330 Wallace Avenue North
Listowel, ON N4W 1L3

Tel: 519-291-2950
Toll Free: 1-888-714-1993

Sign up to our Newsletter

Stay up to date on the Municipality's activities, events, programs and operations by subscribing to our eNewsletters.

This website uses cookies to enhance usability and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy.